This expansion project is a large-scale polymetallic concentrator facility with an ore-processing capacity of 500 t/h. The plant covers crushing & grinding circuit, multi-metal flotation circuit, CIP leaching-adsorption system, tailings treatment and detoxification units. Stable large-volume compressed air is essential for flotation aeration, leaching tank aeration, filter-press actuation, as well as instrument air for the whole-plant automatic control system.

The mine site brings multiple severe challenges to the compressed-air system:
Based on the required 55 m³/min FAD air flow and 0.9 MPa working pressure, our engineering team adopted air-cooled 315 kW two-stage micro-oil screw compressors. A 2-duty +1 standby redundancy layout was implemented for the air station. Matched with micro-heat regenerative adsorption air dryers and vertical large-capacity air receivers, a fully functional compressed-air station for metallurgical processing plant was delivered.
✅ Two-stage rotor solves plateau high-energy-consumption pain point Two-stage compression optimizes compression ratio, greatly improving unit efficiency under low-atmospheric-pressure plateau conditions and cutting long-term power-consumption expenditure for the concentrator. Adopting air-cooled design eliminates cooling water dependency, perfectly fitting water-scarce remote mine-site conditions.
✅ Robust design for ultra-low-temperature mine environment Motors with IP55 protection and F-class insulation, the whole unit is validated for full-range extreme site temperature. Air receivers and drain pipelines are equipped with electric trace-heating and thermal insulation to prevent freezing risks in cold seasons.
✅ Intelligent control compatible with plant-wide DCS system Each compressor is fitted with local PLC & HMI control, with reserved remote signal interfaces. Running status and fault alarm signals can be uploaded to the central DCS platform of the concentrator, realizing unattended operation inside compressor building. Multi-safety protection logic ensures stable operation under 24/7 heavy-load production.
✅ Full-scope supply matching EPC project cycle Apart from compressor main units, complete supporting accessories including intake filters, coolers, valves, base frames, anchor bolts and pipe fittings are supplied. One-year spare parts and special maintenance tools are included. All required DWG-format engineering drawings are submitted for EPC detailed-engineering confirmation before manufacturing.
This solution offers proven reference for compressed-air station construction of large-scale polymetallic concentrator projects located in plateau, high-cold and arid mining zones. If you are working on mineral-processing EPC or mine capacity-expansion projects, our engineering team can provide customized compressed-air-station proposal according to your site altitude, temperature condition, air flow and pressure requirements.
Email to this supplier
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.